INSTALLAZIONE VELOCE-QUICK INSTALLATION-INSTALLATION RAPIDE
SCHNELLINSTALLATION-INSTALACIÓN RÁPIDA - SNELLE INSTALLATIE
2x0.75mm
2
3x1.5mm
2
RG58
3x1.5mm
2
3x1.5mm
2
5x0,75mm
2
2x1.5mm
2
Y
Y
A
C
C1
E
D1
D
22mm + “
X
”
> 25mm
B
> 10mm
1
2
MAX 7 mm
MAGNETO
3x0.5mm
2
1
2
3
PREDISPOSIZIONE TUBI, TUBE ARRANGEMENT
PRÉDISPOSITION DES TUYAUX, VORBEREITUNG DER LEITUNGEN,
DISPOSICIÓN DE TUBOS, VOORBEREIDING LEIDINGEN.
MONTAGGIO ACCESSORI TRASMISSIONE, MOUNTING DRIVE ACCESSORIES, MONTAGE ACCESSOIRES TRANSMISSION,
MONTAGE ANTRIEBSZUBEHÖR, MONTAJE DE ACCESORIOS TRANSMISIÓN, MONTAGE ACCESSOIRES OVERBRENGING.
FISSAGGIO STAFFE FINECORSA (DX E SX),
FASTENING LIMIT SWITCH BRACKETS (RH/LH),
FIXATION ÉTRIERS FIN DE COURSE (DRT ET GCH),
BEFESTIGUNG BÜGEL ANSCHLÄGE (RECHTS UND LINKS),
FIJACIÓN ABRAZADERAS FINAL DE CARRERA (DER. E IZQ.),
BEVESTIGING STANGEN AANSLAG (RECHTS EN LINKS).
MONTAGGIO MOTORE
MOUNTING THE MOTOR
MONTAGE MOTEUR
MONTAGE MOTOR
MONTAJE DEL MOTOR
MONTAGE MOTOR
PREDISPOSIZIONE FISSAGGIO MOTORE, PREPARATION FOR MOTOR MOUNTING,
AMÉNAGEMENT FIXATION MOTEUR, VORBEREITUNG MOTORBEFESTIGUNG,
DISPOSICIÓN FIJACIÓN DEL MOTOR, VOORBEREIDING BEVESTIGING MOTOR.
“X”=
Cremagliera, Rack,
Crémaillère, Zahnstange
Cremallera, Tandheugel
2 -
ARES ULTRA BT A 1000 - ARES ULTRA BT A 1500
D812201 00100_02
Summary of Contents for ARES VELOCE SMART BT A1000
Page 76: ...76 ARES ULTRA BT A 1000 ARES ULTRA BT A 1500 D812201 00100_02 ...
Page 77: ...ARES ULTRA BT A 1000 ARES ULTRA BT A 1500 77 D812201 00100_02 ...
Page 78: ...78 ARES ULTRA BT A 1000 ARES ULTRA BT A 1500 D812201 00100_02 ...
Page 79: ...ARES ULTRA BT A 1000 ARES ULTRA BT A 1500 79 D812201 00100_02 ...