39
MACHINE PREPARATION
8
.
S
Q
UEEGEE ASSEMBLY
T
he squee
g
ee, which is packed separately
f
rom the machine, should be assembled as
shown in the
f
i
g
ure
.
I
nsert
f
irst the le
f
t squee
g
ee pin (1) in the le
f
t arm slot, then the
ri
g
ht pin (2) into the ri
g
ht slot, payin
g
attention to keep the sprin
g
and the washer over
the blade o
f
the arm itsel
f.
T
o simpli
f
y this operation the handwheel placed on top o
f
the
pin should be loosened previously
.
Af
terwards, lock the handwheel to block the
squee
g
ee in position
.
F
it the squee
g
ee hose into its couplin
g
(3)
2
3
1
9
.
S
Q
UEEGEE INCLINATION
D
urin
g
workin
g
operation, the rear rubber has to work sli
g
htly tilted backwards and this
equally in its whole len
g
th
f
or about
5
mm
.
T
his allows the squee
g
ee rubber to be used
f
our times be
f
ore it has to be replaced
.
If
it is necessary to increase the rubber bendin
g
in the central part, tilt the squee
g
ee
body backwards and turn the adjuster (1) counterclockwise
.
If
the rubber bendin
g
is to
be noticeable at the sides o
f
the squee
g
ee, turn the adjuster (1) clockwise
.
10
.
AD
J
USTMENT HEIGHT S
Q
UEEGEE SUPPORT
T
he squee
g
ee has to be re
g
ulated dependin
g
on the wearin
g
o
f
the rubbers
.
T
o adjust
this, rotate the knob (2) clockwise (ti
g
hten) to li
f
t the squee
g
ee and counterclockwise
(loosen) to lower it
.
N
ote:
T
he ri
g
ht and le
f
t wheels must be re
g
ulated in the same amount so that the
squee
g
ee works in parallel to the
f
loor
.
Summary of Contents for CCRRSS2288
Page 1: ... C CR R R RS S2 2 2 28 8 E83007Ͳ00 28 Au Cylin utomat ndrical tic Scr l ubber ...
Page 32: ......
Page 34: ......
Page 36: ......
Page 38: ......
Page 40: ......
Page 42: ......
Page 44: ......
Page 46: ......
Page 48: ......
Page 50: ......
Page 52: ......
Page 54: ......
Page 56: ......
Page 58: ......
Page 60: ......
Page 62: ......
Page 64: ......
Page 66: ......
Page 68: ......
Page 85: ......
Page 87: ......
Page 89: ......
Page 90: ......