![Beta ALP 200 Manual Download Page 117](http://html.mh-extra.com/html/beta/alp-200/alp-200_manual_2742342117.webp)
4
CHECKS AND MAINTENANCE
49
EN
FORK
To maintenance refer at an authorized
service centre Betamotor.
To check the tightening torques see as
shown in the figure.
WARNING:
Tightening of the screws should be
carried out by adjusting the torque
wrench to the stability torque with
repeated tightening until stability
torque has been achieved.
REAR SUSPENSION
LEVERAGE
In order to guarantee optimal operation
and duration over time of the progressive
leverage of the rear suspension, it is rec-
ommended to periodically check correct
tightness of nuts and bolts.
Verify that suspension nuts and bolts are at
the indicated torque.
20Nm
65Nm
65Nm
65Nm
65Nm
Summary of Contents for ALP 200
Page 14: ...1 INFORMAZIONI GENERALI 14 I IMPIANTO ELETTRICO SCHEMA ELETTRICO ...
Page 60: ...60 ...
Page 64: ...64 ...
Page 82: ...1 GENERAL INFORMATION 14 EN ELECTRICAL SYSTEM ELECTRICAL DIAGRAM ...
Page 128: ...60 ...
Page 132: ...64 ...
Page 150: ...1 ALLGEMEINE ANGABEN 14 D ELEKTRISCHE ANLAGE SCHALTPLAN ...
Page 196: ...60 ...
Page 200: ...64 ...
Page 218: ...1 GÉNÉRALITÉS 14 F SYSTÈME ÉLECTRIQUE SCHÉMA ÉLECTRIQUE ...
Page 264: ...60 ...
Page 268: ...64 ...
Page 286: ...1 INFORMACIONES GENERALES 14 E SISTEMA ELÉCTRICO ESQUEMA ELÉCTRICO ...
Page 332: ...60 ...
Page 336: ...64 ...
Page 354: ...1 ALGEMENE INFORMATIE 14 NL ELEKTRISCHE STRUCTUUR BEDRADINGSSCHEMA ...
Page 400: ...60 ...
Page 404: ...64 ...