G28
Plumbing Schematic for Pro 80 Boom
REF
P/N
DESCRIPTION
QTY
1
EPDM10
Hose, EPDM 1", 300psi, 50 Feet
1
2
EPDM10
Hose, EPDM 1", 300psi, 28 Feet
1
3
EPDM10
Hose, EPDM 1", 300psi, 30 Feet
1
4
EPDM10
Hose, EPDM 1", 300psi, 52 Feet
1
5
EPDM34
Hose, EPDM 3/4", 300psi, 48" lg
2
6
71409
Hose, EPDM 3/4" x 19", 300psi
43
7
QJ363B7502NYBVI
Hose Shank, 3-way T-body, 3/4"
37
8
QJ363B7501NYBVI
Hose Shank, 3-way L-body, 3/4"
12
*
QJ111SQ112303SS
Nozzle Clamp, 1-1/2”Sq. S.S.
49
9
EL-3410PP
Elbow, 3/4 mpt x 1 hb Polypro
4
10
T-3434F
Barb, Female Tee - 3/4 fpt x 3/4 hb
4
11
T-34
Barb, Tee - 3/4 hb x 3/4 hb, Polypro
4
Summary of Contents for Field-Pro IV 1200
Page 9: ...A8 SPECIFICATIONS ...
Page 11: ...A10 A C D E G P N 67657 A P N DEC HAZ01 A Safety Sign Locations B C F P N DEC HAZ08 A ...
Page 19: ...B6 ...
Page 29: ...C10 Raven 450 Spray Wiring Diagram ...
Page 32: ...C13 Raven 440 Spray Wiring Diagram ...
Page 50: ...E3 50 Hours 12 Hours 2 places 12 Hours 2 places 12 Hours Grease Zerk Locations ...
Page 64: ...G1 PARTS LISTING ...
Page 69: ...G6 ...
Page 70: ...G7 BASE PLUMBING ...
Page 72: ...G9 Pro 60 Boom ...
Page 73: ...G10 ...
Page 78: ...G15 Pro 80 Boom ...
Page 79: ...G16 ...
Page 84: ...G21 Pro 60 Boom Hydraulic Schematic ...
Page 86: ...G23 Pro 80 Boom Hydraulic Schematic ...
Page 88: ...G25 Pro 60 plumbing ...
Page 90: ...G27 Pro80 Boom Plumbing ...
Page 94: ...G31 ...
Page 96: ...G33 Foam Guidance system Model 6 or 10 ...
Page 100: ...G37 Rinse Assembly ...
Page 102: ...G39 Deluxe Plumbing with 4 Valve Stack Assembly ...
Page 104: ...G41 Deluxe Plumbing with 3 Valve Stack Assembly ...
Page 106: ...H1 Field Pro IV 1200 Base Wiring Details ...
Page 108: ...H3 ...