D6
6. Repeat steps 3-5 to unfold opposite wing.
7. Lower center section to desired spray height.
During operation, each wing can be adjusted to a posi-
tion ranging from -5 degrees to +15 degrees from level
in order to follow varying ground contours, such as terraces and waterways.
Retracting Boom Wings.
To retract boom wings, follow the above steps in reverse. Be sure to reposition stow locks
from “unlock” position to “lock” position.
To avoid damage to the wings and/or sprayer, always
make sure the center section is raised to its full height
before attempting to fold the wings into the transport position.
NOTE:
IMPORTANT:
Summary of Contents for Field-Pro IV 1200
Page 9: ...A8 SPECIFICATIONS ...
Page 11: ...A10 A C D E G P N 67657 A P N DEC HAZ01 A Safety Sign Locations B C F P N DEC HAZ08 A ...
Page 19: ...B6 ...
Page 29: ...C10 Raven 450 Spray Wiring Diagram ...
Page 32: ...C13 Raven 440 Spray Wiring Diagram ...
Page 50: ...E3 50 Hours 12 Hours 2 places 12 Hours 2 places 12 Hours Grease Zerk Locations ...
Page 64: ...G1 PARTS LISTING ...
Page 69: ...G6 ...
Page 70: ...G7 BASE PLUMBING ...
Page 72: ...G9 Pro 60 Boom ...
Page 73: ...G10 ...
Page 78: ...G15 Pro 80 Boom ...
Page 79: ...G16 ...
Page 84: ...G21 Pro 60 Boom Hydraulic Schematic ...
Page 86: ...G23 Pro 80 Boom Hydraulic Schematic ...
Page 88: ...G25 Pro 60 plumbing ...
Page 90: ...G27 Pro80 Boom Plumbing ...
Page 94: ...G31 ...
Page 96: ...G33 Foam Guidance system Model 6 or 10 ...
Page 100: ...G37 Rinse Assembly ...
Page 102: ...G39 Deluxe Plumbing with 4 Valve Stack Assembly ...
Page 104: ...G41 Deluxe Plumbing with 3 Valve Stack Assembly ...
Page 106: ...H1 Field Pro IV 1200 Base Wiring Details ...
Page 108: ...H3 ...