1-19
Kenworth T600-T660-T800-W900
rev 10/7/13
Installation Procedures
33
Attach Stealth to the
NITE
Duct.
After the controls are installed and the
stealth is cut and rotated 90° fasten the
stealth to the
NITE Phoenix
duct using
four 1″ X 5/16 self-tapping screws.
Apply silicone sealant around seam.
Duct shown has been cut and rotated 90
degrees. See instructions page 1-22.
NOTE: Silicone sealant is not included
in kit.
Attach
NITE Phoenix
Duct to Back
Wall of Sleeper.
Press the top of the
duct up against the back wall. Make
sure the duct is square and level against
the back wall. Use 1″ X 5/16 hex head
self-tapping screws to attach top of duct
to back wall. Place 3 - 5 screws in each
duct opening and install at different
angles (A). Take care not to over
tighten. Snap both louvers into place
(B).
Attach Flex Hose to Stealth and
Elbow.
Secure with 4″ clamps.
32
34
B
A
Cutting and rotating the Stealth elbow (before installing the stealth
adapter see pg 1-22 for instructions)
Summary of Contents for NITE Phoenix
Page 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Page 39: ...2 18 Electrical Installation ...
Page 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Page 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Page 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 60: ...Section 6 Operating Instructions ...
Page 64: ...Section 7 Battery Management System BMS Installation ...
Page 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Page 66: ...7 2 Battery Management ...
Page 67: ...7 3 Battery Management ...