1-9
Kenworth T600-T660-T800-W900
rev 10/7/13
Installation Procedures
Prepare the Work Area.
Start by
disconnecting the ground wire from the
starting batteries. Set up your work
light, clear the sleeper compartment of
loose items, and remove the divider
curtain if there is one. Then remove the
mattress.
Remove Aluminum Bunk Decking
Remove the screws securing the center
panel of the bunk deck (A) exposing the
center storage area (B).
Roll Floor Insulation Back.
Pull up
the floor insulation and roll it back out
of your way as shown.
1
3
A
B
Attention: The evaporator blower in the Phoenix will not rotate.
This unit will always be side discharge!
2
Summary of Contents for NITE Phoenix
Page 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Page 39: ...2 18 Electrical Installation ...
Page 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Page 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Page 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 60: ...Section 6 Operating Instructions ...
Page 64: ...Section 7 Battery Management System BMS Installation ...
Page 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Page 66: ...7 2 Battery Management ...
Page 67: ...7 3 Battery Management ...