
2-10
Electrical Installation
Connect Battery Management System
to Start Batteries.
2 wire harness from 8
pin connector. This harness routes from
the BMS in the Aux battery box to the
truck starting battery box.
This harness
must be loomed.
The red connects
through the supplied, field installed, 5
amp mini fuse and holder (A) to any 12
volt POS post in the truck starting battery
box. The black connects to any 12 volt
NEG post in the battery box. It is vital
that these wires connect in each box.
Attach Can Bus Cable to Unit.
Connect can bus harness, coming from
the BMS, into connector at the
NITE
Phoenix
unit – it only fits one way.
Also
connect the digital controller harness
installed in an earlier step.
17
18
Red
Black
A
Summary of Contents for NITE Phoenix
Page 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Page 39: ...2 18 Electrical Installation ...
Page 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Page 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Page 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 60: ...Section 6 Operating Instructions ...
Page 64: ...Section 7 Battery Management System BMS Installation ...
Page 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Page 66: ...7 2 Battery Management ...
Page 67: ...7 3 Battery Management ...