
1-12
Kenworth T600-T660-T800-W900
rev 10/7/13
Installation Procedures
Determine Location for
Recirculation Grill
Install the grill in
the center support wall (see photo
showing outline for cutout marked on
center support wall)The opening
should be positioned in front of where
the
NITE Phoenix
unit will be
positioned. The size should be 11-1/2″
x 4-5/8″. Use provided template for
marking.
Cut Opening for
Recirculation Grill
Cut an opening (A) with a metal-
cutting air saw or jigsaw for the
recirculation grill in the support wall.
Attach grill (B) to the center wall
using
black Phillips head screws.
NOTE: Take precautions not to damage
carpet or upholstery.
10
11
TEMPLATE
Summary of Contents for NITE Phoenix
Page 21: ...Section 2 Electrical Installation Rev 9 25 2013 ...
Page 39: ...2 18 Electrical Installation ...
Page 42: ...Section 3 ESPAR Fuel Operated Heater Installation ...
Page 53: ...Section 4 WEBASTO Fuel Operated Heater Installation ...
Page 56: ...5 1 External Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 57: ...5 2 Internal Wiring Diagram Use for units manufactured after 2 08 2012 ...
Page 58: ...5 3 External Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 59: ...5 4 Internal Wiring Diagram Use for units manufactured prior to 2 08 2012 ...
Page 60: ...Section 6 Operating Instructions ...
Page 64: ...Section 7 Battery Management System BMS Installation ...
Page 65: ...7 1 Battery Management Bergstrom NITE System BMS 100 Installation ...
Page 66: ...7 2 Battery Management ...
Page 67: ...7 3 Battery Management ...