
Loctite and start BOTH 3X4 SHCS into the gearbox, then tighten both of them.
These bolts do NOT require gorilla torque; all that will accomplish is pulling the
threads out. If that happens, we can helicoil the gearbox.
Slide the horizontal fin clamp onto the boom.
These instructions apply to BOTH Standard and EB Versions.
Insert the tail boom into the boom clamps at the rear of the heli; pushing it ALL
the way in, ensuring the dogbone has engaged the delrin coupler. The end of
the boom should go past the most forward boom clamp. Now pull the boom
BACK out by 1mm. This is important to remove any rearward pressure on the TT
drive system.