background image

Installation and Operation Manual

   

Solar  |  solar storage cylinder

IDRA MS

Installation and Operation Manual

EN

   

Summary of Contents for IDRA MS 200

Page 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA MS Installation and Operation Manual EN...

Page 2: ...2...

Page 3: ...caused by improper installation adjustment maintenance or use RANGE MODEL CODE IDRA MS 200 BERETTA 20015324 IDRA MS 300 BERETTA 20015328 IDRA MS 430 BERETTA 20015333 IDRA MS 550 BERETTA 20015340 ACCES...

Page 4: ...xed with water in a percentage varying from 30 to 50 as instructed in the installation and maintenance manual for the B solar collectors b b Only fill the solar collector primary circuit with water an...

Page 5: ...dade do termoacumulador l T067659EPE02 Conexi n a tierra obligatoria Liga o terra obrigat ria Obligatory ground connection W Pot ncia el ctrica consumida Pot ncia consumida max pela serp sup T Prim ri...

Page 6: ...length of sensor sockets 16 175 mm Sleeve for electric heating element not supplied 1 1 2 F Coil water capacity 5 7 9 3 11 12 8 l Coil heat exchange surface area 0 94 1 53 1 8 2 1 m2 Maximum operating...

Page 7: ...ollector probe Note The above schematic is purely indicative b b B IDRA MS storage cylinders are delivered without a boiler heating pump A suitably rated pump must be provided and installed separately...

Page 8: ...the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B...

Page 9: ...Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA...

Page 10: ...solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable e...

Page 11: ...on hand to lift the storage cylinder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is abl...

Page 12: ...ne Silicon ions less than 30 ppm Technical Assistance Centre 14 PUTTING INTO SERVICE It is essential to perform the following checks before starting up or testing the functioning of the storage cylind...

Page 13: ...Centre or by a qualified heating engineer at least once a year Perform the following operations before beginning any maintenance Switch the electricity supply to the storage cylinder s valve group and...

Page 14: ...limiter Fit a flow reducer There are blockages or deposits in the domestic hot water circuit Check and clean as necessary The pump is malfunctioning Check the pump The water temperature from the boile...

Page 15: ...t on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the storage cylinder s thermostat to its min...

Page 16: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Reviews: