background image

4

GENERAL

1  GENERAL SAFETY INFORMATION

 

b

Check that the product is complete, undamaged 

and as ordered as soon as you receive it. Report any 

discrepancies or damage to the 

B

 dealer who 

sold it.

 

b

This product must be installed by a legally qualified 

heating engineer. On completion of the installation, 

the installer must issue the owner with a declaration 

of conformity confirming that the installation has been 

completed to the highest standards in compliance with 

the instructions provided by 

B

 in this instruction 

manual, and that it conforms to all applicable laws 

and standards.

 

b

This product must only be used for the purpose 

for which it is designed and made, as specified by 

B

B

 declines all responsibility, contractual or 

other, for damage to property or injury to persons or 

animals caused by improper installation, adjustment, 

maintenance or use.

 

b

The product must be serviced at least once a year. 

Servicing must be arranged in advance with the 

B

 Technical Assistance Centre.

 

b

All servicing and repairs must be performed by a 

qualified heating engineer.

 

b

If water leaks from the storage cylinder, turn off 

the water supply and contact 

B

’s Technical 

Assistance Centre or a qualified heating engineer 

immediately.

 

b

If the solar storage cylinder is not going to be 

used for an extended period of time, contact the 

manufacturer’s  Technical Assistance Centre to have 

at least the following operations performed:

 -Close the shut-off cocks for the domestic hot water 

circuit

 -Shut down the boiler connected to the storage 

cylinder as instructed in its own manual

 -Switch the storage cylinder OFF at the control panel 

(if fitted) and at the mains power switch

 -Drain the central heating circuit and domestic hot 

water circuit if there is any risk of freezing.

 

b

Anti-freeze (propylene glycol) is available separately 

and must be mixed with water in a percentage varying 

from 30% to 50% as instructed in the installation and 

maintenance manual for the 

B

 solar collectors.

 

b

Only fill the solar collector (primary) circuit with water 

and glycol premixed in the percentages specified in 

the 

B

 installation and maintenance manual.

 

b

This instruction manual is an integral part of the 

product. It must be kept safe and must ALWAYS 

accompany the product, even if it is sold to 

another owner or transferred to another user or to 

another installation. If you lose this manual, order a 

replacement immediately.

2  PRECAUTIONS

The operation of any appliance that uses electrical power 

demands that a number of fundamental safety precautions 

be respected. In particular:

 

a

Never attempt to install the system without using 

suitable personal protection equipment and 

without following all applicable occupational safety 

standards.

 

a

Do not touch the storage cylinder when barefoot or 

wet if it has any electrical accessories connected to 

it.

 

a

Never clean or service the storage cylinder without 

first turning the mains power switch OFF to disconnect 

all electrical accessories (if fitted) from the mains 

electricity supply.

 

a

Never pull, disconnect, or twist any electrical cables 

coming from the appliance even if it is disconnected 

from the mains electricity supply.

 

a

Do not expose the storage cylinder to the elements. It 

is not designed for use outdoors.

 

a

If the pressure in the solar collector circuit drops, do 

not top up with water alone, since this increases the 

risk of damage from freezing.

 

a

Do not use connections or safety devices or fittings 

(expansion vessels, pipes, insulation) that are not 

specifically designed and tested for use in solar 

water heating systems.

 

a

Do not allow children or infirm persons to operate the 

system unsupervised.

 

a

Do not dispose of packaging material into the 

environment, or leave it within the reach of children, 

since it can become a potential hazard. Dispose of 

packaging material in compliance with applicable 

legislation.

General

Summary of Contents for IDRA MS 200

Page 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA MS Installation and Operation Manual EN...

Page 2: ...2...

Page 3: ...caused by improper installation adjustment maintenance or use RANGE MODEL CODE IDRA MS 200 BERETTA 20015324 IDRA MS 300 BERETTA 20015328 IDRA MS 430 BERETTA 20015333 IDRA MS 550 BERETTA 20015340 ACCES...

Page 4: ...xed with water in a percentage varying from 30 to 50 as instructed in the installation and maintenance manual for the B solar collectors b b Only fill the solar collector primary circuit with water an...

Page 5: ...dade do termoacumulador l T067659EPE02 Conexi n a tierra obligatoria Liga o terra obrigat ria Obligatory ground connection W Pot ncia el ctrica consumida Pot ncia consumida max pela serp sup T Prim ri...

Page 6: ...length of sensor sockets 16 175 mm Sleeve for electric heating element not supplied 1 1 2 F Coil water capacity 5 7 9 3 11 12 8 l Coil heat exchange surface area 0 94 1 53 1 8 2 1 m2 Maximum operating...

Page 7: ...ollector probe Note The above schematic is purely indicative b b B IDRA MS storage cylinders are delivered without a boiler heating pump A suitably rated pump must be provided and installed separately...

Page 8: ...the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B...

Page 9: ...Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA...

Page 10: ...solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable e...

Page 11: ...on hand to lift the storage cylinder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is abl...

Page 12: ...ne Silicon ions less than 30 ppm Technical Assistance Centre 14 PUTTING INTO SERVICE It is essential to perform the following checks before starting up or testing the functioning of the storage cylind...

Page 13: ...Centre or by a qualified heating engineer at least once a year Perform the following operations before beginning any maintenance Switch the electricity supply to the storage cylinder s valve group and...

Page 14: ...limiter Fit a flow reducer There are blockages or deposits in the domestic hot water circuit Check and clean as necessary The pump is malfunctioning Check the pump The water temperature from the boile...

Page 15: ...t on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the storage cylinder s thermostat to its min...

Page 16: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Reviews: