background image

7

GENERAL

7  WATER CIRCUIT

TYPICAL WATER SYSTEM SCHEMATIC

Solar regulator

°C

M

10

10

10

6

7

9

8

12

11

13

PS

5

16

2

R

M

4

3

UAC

EAF

1

1

9

8

10

10

10

10

7

15 14

17

19

PR

10

10

16

SB1

SCo

Water control system

Solar collector

Collector temperature sensor socket

Manual bleed valve

Vent cock

Vent valve

Pressure gauge

Safety valve

Drain

Expansion vessel

10 

Disconnect valves

11 

Temperature gauge

12 

Flow regulator

13 

Flow meter

14 

Pressure reducer

15 

Water softener filter

16 

Non-return valve

17 

Thermostatic mixer valve

18 

Solar storage cylinder

19 

DHW recirculation temperature sensor

UAC

  Domestic hot water outlet

EAF

  Domestic cold water inlet

M

 

Collector outlet

R

 

Collector return

PR

 

DHW recirculation pump

PS

 

Solar collector circuit pump

SB1

  Storage cylinder bottom temperature sensor

SCo

  Collector probe

Note! The above schematic is purely indicative.

 

b

B

 

IDRA MS

 storage cylinders are delivered without a boiler heating pump. A suitably rated pump must be 

provided and installed separately.  Flow rate from the solar collector circuit depends on the type and number of 

collectors installed. For further information, consult the manual for the collectors.

 

b

The domestic hot water system MUST INCLUDE an expansion vessel, safety valve, automatic vent valve and 

storage cylinder drain cock.

 

b

Safety valves must be connected to a suitable collection and drain system. The manufacturer declines all 

responsibility for damage caused by water escaping from safety valves.

 

b

The choice of system components and the method of their installation are left up to the heating engineer installing 

the system. Installers must use their expertise to ensure proper installation and functioning in conformity to all 

applicable legislation.

 

b

Circuits filled with anti-freeze must be fitted with water disconnectors.

Summary of Contents for IDRA MS 200

Page 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA MS Installation and Operation Manual EN...

Page 2: ...2...

Page 3: ...caused by improper installation adjustment maintenance or use RANGE MODEL CODE IDRA MS 200 BERETTA 20015324 IDRA MS 300 BERETTA 20015328 IDRA MS 430 BERETTA 20015333 IDRA MS 550 BERETTA 20015340 ACCES...

Page 4: ...xed with water in a percentage varying from 30 to 50 as instructed in the installation and maintenance manual for the B solar collectors b b Only fill the solar collector primary circuit with water an...

Page 5: ...dade do termoacumulador l T067659EPE02 Conexi n a tierra obligatoria Liga o terra obrigat ria Obligatory ground connection W Pot ncia el ctrica consumida Pot ncia consumida max pela serp sup T Prim ri...

Page 6: ...length of sensor sockets 16 175 mm Sleeve for electric heating element not supplied 1 1 2 F Coil water capacity 5 7 9 3 11 12 8 l Coil heat exchange surface area 0 94 1 53 1 8 2 1 m2 Maximum operating...

Page 7: ...ollector probe Note The above schematic is purely indicative b b B IDRA MS storage cylinders are delivered without a boiler heating pump A suitably rated pump must be provided and installed separately...

Page 8: ...the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B...

Page 9: ...Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA...

Page 10: ...solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable e...

Page 11: ...on hand to lift the storage cylinder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is abl...

Page 12: ...ne Silicon ions less than 30 ppm Technical Assistance Centre 14 PUTTING INTO SERVICE It is essential to perform the following checks before starting up or testing the functioning of the storage cylind...

Page 13: ...Centre or by a qualified heating engineer at least once a year Perform the following operations before beginning any maintenance Switch the electricity supply to the storage cylinder s valve group and...

Page 14: ...limiter Fit a flow reducer There are blockages or deposits in the domestic hot water circuit Check and clean as necessary The pump is malfunctioning Check the pump The water temperature from the boile...

Page 15: ...t on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the storage cylinder s thermostat to its min...

Page 16: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Reviews: