10  UNPACKING THE PRODUCT

B

 

IDRA MS

 storage cylinders are delivered in a single 

package, protected by a cardboard box on a wooden 

pallet.

The following items are delivered in a plastic bag inside the 

packaging:

 - Instruction manual

 - Spare parts catalogue

 - Hydraulic test certificate.

A

B

H

MODEL

A

B

H

Weight 

(Kg)

200

700

700

1480

85

300

700

700

1980

115

430

850

850

1790

150

550

850

850

2130

165

11  HANDLING

Make sure that any lifting equipment is of adequate 

capacity to lift and move the storage cylinder. Remove the 

brackets (1) to free the storage cylinder.

To lift the storage cylinder, remove the plug (2) and 

insulation (3) and screw an eyebolt (Ø 10 mm) of suitable 

capacity for the weight of the cylinder into the hole (4).

1

1

1

2

4

3

If suitable equipment is not on hand to lift the storage 

cylinder off the pallet using the eyebolt, proceed as follows.

 - Place a platform of about half the height of the pallet 

near the storage cylinder. Make sure the platform is 

able to support the weight of the storage cylinder

 - Remove the brackets (1) then carefully rotate and 

slide the storage cylinder off the pallet on to the 

platform

 - Make sure that the storage cylinder is perfectly 

stable, and then remove the pallet

 - Carefully rotate and slide the storage cylinder off the 

platform on to the floor

 - Remove the platform. Position the storage cylinder as 

required.

Adjust the feet to ensure that the storage cylinder is 

perfectly level.

17

 

b

Wear suitable personal protective equipment and use 

suitable safety devices.

 

a

Do not dispose of packaging material into the 

environment, or leave it within the reach of children, 

since it can become a potential hazard. Dispose of 

packaging material in compliance with applicable 

legislation.

Installer

Summary of Contents for IDRA MS 200

Page 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA MS Installation and Operation Manual EN...

Page 2: ...2...

Page 3: ...caused by improper installation adjustment maintenance or use RANGE MODEL CODE IDRA MS 200 BERETTA 20015324 IDRA MS 300 BERETTA 20015328 IDRA MS 430 BERETTA 20015333 IDRA MS 550 BERETTA 20015340 ACCES...

Page 4: ...xed with water in a percentage varying from 30 to 50 as instructed in the installation and maintenance manual for the B solar collectors b b Only fill the solar collector primary circuit with water an...

Page 5: ...dade do termoacumulador l T067659EPE02 Conexi n a tierra obligatoria Liga o terra obrigat ria Obligatory ground connection W Pot ncia el ctrica consumida Pot ncia consumida max pela serp sup T Prim ri...

Page 6: ...length of sensor sockets 16 175 mm Sleeve for electric heating element not supplied 1 1 2 F Coil water capacity 5 7 9 3 11 12 8 l Coil heat exchange surface area 0 94 1 53 1 8 2 1 m2 Maximum operating...

Page 7: ...ollector probe Note The above schematic is purely indicative b b B IDRA MS storage cylinders are delivered without a boiler heating pump A suitably rated pump must be provided and installed separately...

Page 8: ...the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B...

Page 9: ...Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA...

Page 10: ...solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable e...

Page 11: ...on hand to lift the storage cylinder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is abl...

Page 12: ...ne Silicon ions less than 30 ppm Technical Assistance Centre 14 PUTTING INTO SERVICE It is essential to perform the following checks before starting up or testing the functioning of the storage cylind...

Page 13: ...Centre or by a qualified heating engineer at least once a year Perform the following operations before beginning any maintenance Switch the electricity supply to the storage cylinder s valve group and...

Page 14: ...limiter Fit a flow reducer There are blockages or deposits in the domestic hot water circuit Check and clean as necessary The pump is malfunctioning Check the pump The water temperature from the boile...

Page 15: ...t on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the storage cylinder s thermostat to its min...

Page 16: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Reviews: