background image

12

TECHNICAL ASSISTANCE CENTRE

12  PLACE OF INSTALLATION

B

 

IDRA MS

 storage cylinders can be installed in any 

room where there is no specific requirement for an electrical 

protection rating higher than IP X0D.

 

b

Respect the minimum specified installation distances 

to ensure correct installation and access for 

maintenance.

≥ 0,4 m

≥ 0,6 m

≥ 0,3 m

≥ 0,4 m

13  INSTALLATION IN OLDER 

SYSTEMS AND SYSTEMS 

REQUIRING MODERNISATION

When installing 

B

 

IDRA MS

 storage cylinders in old 

systems or systems requiring modernisation, always 

perform the following checks.

 - Make sure that the system is fitted with safety and 

control devices in accordance with applicable 

legislation and standards

 - Make sure that the central heating circuit has been 

flushed out to remove all sludge and lime scale, and 

has been vented and seal tested

 - Make sure that a suitable water treatment system is 

installed if the quality of the supply/recirculation water 

so demands (refer to the reference values listed in the 

table alongside).

REFERENCE VALUES

pH

6-8

Electrical conductivity

less than 200 μS/cm (25°C)

Chlorine ions

less than 50 ppm

Sulphuric acid ions

less than 50 ppm

Total iron

less than 0.3 ppm

Alkalinity M

less than 50 ppm

Total hardness

less than 35°F

Sulphur ions

none

Ammonia ions

none

Silicon ions

less than 30 ppm

Technical Assistance Centre

14  PUTTING INTO SERVICE

It is essential to perform the following checks before 

starting up or testing the functioning of the storage cylinder. 

In particular, check that:

 - The supply cocks in the domestic water circuit are 

all open

 - The water connections to the solar storage cylinder's 

valve group have been made correctly

 - All the pipes in the water circuit have been insulated 

in conformity to relevant standards

 - The electrical connections have been made correctly 

(use the flexible cable conduits provided to route the 

cables. See pages 9 - 10 as well as the manuals for 

all installed accessories

 - The solar collector circuit has been correctly flushed 

out and filled with water-glycol mix, and all air has 

been bled out of the circuit (see the manual for the 

solar collectors)

 - Put the solar collectors into service. See the manuals 

for the solar collectors and associated accessories.

Once the system has been started up, perform the following 

checks.

 - Make sure that all pumps are free and rotate in the 

right direction

 - Check that the flow rate in the solar collector circuit is 

equivalent to 30 l/h for each m

2

 of collector area

 - Check that the solar collector circuit has been 

properly bled

 - Turn the main power switch OFF and make sure 

that the solar water heating system shuts down 

completely.

Provided the above checks have been completed 

satisfactorily, restart the system and verify its performance.

Summary of Contents for IDRA MS 200

Page 1: ...Installation and Operation Manual Solar solar storage cylinder IDRA MS Installation and Operation Manual EN...

Page 2: ...2...

Page 3: ...caused by improper installation adjustment maintenance or use RANGE MODEL CODE IDRA MS 200 BERETTA 20015324 IDRA MS 300 BERETTA 20015328 IDRA MS 430 BERETTA 20015333 IDRA MS 550 BERETTA 20015340 ACCES...

Page 4: ...xed with water in a percentage varying from 30 to 50 as instructed in the installation and maintenance manual for the B solar collectors b b Only fill the solar collector primary circuit with water an...

Page 5: ...dade do termoacumulador l T067659EPE02 Conexi n a tierra obligatoria Liga o terra obrigat ria Obligatory ground connection W Pot ncia el ctrica consumida Pot ncia consumida max pela serp sup T Prim ri...

Page 6: ...length of sensor sockets 16 175 mm Sleeve for electric heating element not supplied 1 1 2 F Coil water capacity 5 7 9 3 11 12 8 l Coil heat exchange surface area 0 94 1 53 1 8 2 1 m2 Maximum operating...

Page 7: ...ollector probe Note The above schematic is purely indicative b b B IDRA MS storage cylinders are delivered without a boiler heating pump A suitably rated pump must be provided and installed separately...

Page 8: ...the boiler and solar collectors Installers must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation Psr B A C A Temperature sensor socket B...

Page 9: ...Diameter length of solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA...

Page 10: ...solar controller sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable e...

Page 11: ...on hand to lift the storage cylinder off the pallet using the eyebolt proceed as follows Place a platform of about half the height of the pallet near the storage cylinder Make sure the platform is abl...

Page 12: ...ne Silicon ions less than 30 ppm Technical Assistance Centre 14 PUTTING INTO SERVICE It is essential to perform the following checks before starting up or testing the functioning of the storage cylind...

Page 13: ...Centre or by a qualified heating engineer at least once a year Perform the following operations before beginning any maintenance Switch the electricity supply to the storage cylinder s valve group and...

Page 14: ...limiter Fit a flow reducer There are blockages or deposits in the domestic hot water circuit Check and clean as necessary The pump is malfunctioning Check the pump The water temperature from the boile...

Page 15: ...t on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the storage cylinder s thermostat to its min...

Page 16: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Reviews: