background image

20

TECHNICAL ASSISTANCE CENTRE

19  recycling and disPosal

At the end of its useful working life, do not abandon the storage cylinder in the environment, but dispose of it through the 

proper channels in accordance with applicable legislation.

20  troUblesHooting

SUPPLEMENTARY HEATING CIRCUIT

FAULT

CAUSE

SOLUTION

The storage cylinder functions 

incorrectly or irregularly.

Flow rate too high.

 -Fit a pressure limiter.

 -Fit a flow reducer.

There are blockages or deposits in the 

domestic hot water circuit.

 -Check and clean as necessary.

The pump is malfunctioning.

 -Check the pump.

The water temperature from the boiler 

is too low.

 -Check the temperature setting.

There is air in the primary circuit.

 -Bleed the circuit.

SOLAR COLLECTOR CIRCUIT

FAULT

CAUSE

SOLUTION

The storage cylinder functions 

incorrectly or irregularly.

There is air in the circuit.

 -Bleed the circuit.

The flow rate is too low or too high.

 -Check the flow rate of the collector 

circuit.

Pressure is too low.

 -Check that circuit pressure is ap-

proximately 3 bar when cold.

There is lime scale or sludge in the 

cylinder.

 -Check and clean as necessary.

The storage cylinder loses a lot of 

heat overnight.

There is natural circulation to the 

collectors.

 -Make sure that the non-return valve is 

efficient and closes properly. Repla-

ce if necessary.

Summary of Contents for IDRA DS 1000

Page 1: ...solar storage cylinder IDRA DS INSTALLATION MANUAL USER MANUAL SOLAR ...

Page 2: ...horised B service centre Their personnel are specially trained to keep your solar storage cylinder effi cient and cheap to run B service centres also stock any original spare parts that might be required This manual contains important instructions and precau tions that must be observed to ensure the trouble free in stallation and efficient functioning of your B solar sto rage cylinder Please accep...

Page 3: ...pecifications 6 7 Water circuit 8 8 Location of sensors 9 9 Overall dimensions and water fittings 10 INSTALLER 13 10 Unpacking the product 13 11 Handling 14 12 Place of installation 16 13 Installation in older systems and systems requiring modernisation 16 TECHNICAL ASSISTANCE CENTRE 17 14 Putting into service 17 15 Temporary shutdown 17 16 Preparing for extended periods of disuse 17 17 Maintenanc...

Page 4: ... Drain the central heating circuit and domestic hot water circuit if there is any risk of freezing b b This instruction manual is an integral part of the pro duct It must be kept safe and must ALWAYS accom pany the product even if it is sold to another owner or transferred to another user or to another installation If you lose this manual order a replacement imme diately 2 Precautions The operatio...

Page 5: ... W Elektrischer Leistung m2 m2 Leistungsaufnahme obere Rohrschlange kW Erzeugung von Brauchwasser l 1 Primärkreislauftemperatur T 80 C SOLAR STORAGE CYLINDER Model Serial number Code Year Power absorbed by top coil T primary 80 C Domestic Hot Water production top coil Maximum working pressure of storage cylinder Storage cylinder capacity Electrical consumption Power supply obere Rohrschlange 35 C ...

Page 6: ...um operating pressure of storage cylinder 10 7 bar Maximum operating pressure of coils 10 bar Maximum operating temperature 99 C Net weight 78 109 139 169 214 244 Kg Heat loss according to EN 12897 2006 at ΔT 45 C 2 79 2 24 2 18 2 74 2 50 2 50 kWh 24h Performance obtained with a primary circuit temperature of 60 C Power absorbed by top coil 11 0 15 8 19 5 23 4 33 0 33 0 kW Domestic hot water produ...

Page 7: ...000 3000 4000 Mod 750 1000 Mod 550 Mod 430 Mod 300 Mod 200 FLOW RATE l h Pressure drops BOTTOM COIL PRESSURE DROP mbar 0 0 200 50 100 150 200 250 300 350 400 600 800 1000 1200 1400 1600 Mod 550 Mod 750 Mod 430 Mod 300 Mod 200 Mod 1000 FLOW RATE l h Tests performed with a 30 glycol water solution ...

Page 8: ... PI Mix Mixed central heating pump PB Solar storage cylinder heating pump PR DHW recirculation pump PD Direct central heating pump PS Solar collector circuit pump SB1 Storage cylinder top temperature sensor SB2 Storage cylinder bottom temperature sensor SCo Collector probe Note The above schematic is purely indicative b b B IDRA DS storage cylinders are delivered without a boiler heating pump A su...

Page 9: ... must use their expertise to ensure proper installation and functioning in compliance with all applicable legislation B A Psc Pau Psr C A Temperature sensor socket B Temperature sensor C Guide Psc Boiler temperature sensor socket Pau Auxiliary temperature sensor socket Psr Solar controller temperature sensor socket b b Joins between temperature sensor cables and control panel extension cables must...

Page 10: ... 175 mm Psr Diameter length of solar controller sensor socket 16 175 mm Pau Diameter length of auxiliary temperature sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD1 Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable entrance ICP Rear cable entrance A 365 460 mm B 625 860 mm C 675 910 mm D 1000 1330 mm E 170 205 mm ...

Page 11: ...ength of solar controller sensor socket 16 175 mm Pau Diameter length of auxiliary temperature sensor socket 16 175 mm RE Sleeve for electric heating element not supplied 1 F mm AD1 Diameter length of magnesium anode 33 450 33 520 mm TR Temperature gauge DSA Sensor power cable entrance ICP Rear cable entrance A 365 460 mm B 875 960 mm C 955 1080 mm D 1490 1650 mm E 170 205 mm F 445 505 mm G 430 44...

Page 12: ...f auxiliary temperature sensor socket 2 x 7 210 mm RE Sleeve for electric heating element not supplied 1 F mm AD1 Diameter length of first magnesium anode 33 450 mm AD2 Diameter length of second magnesium anode 33 450 mm TR Temperature gauge A 400 400 mm B 436 525 mm C 950 1020 mm D 520 675 mm E 75 75 mm F 365 365 mm G 384 439 mm H 909 1019 mm I 994 1111 mm L 130 130 mm N 235 235 mm O 1459 1695 mm...

Page 13: ...in a single package protected by a plastic bag inside a protective foam rubber wrapping and supported by a wooden pallet The following items are delivered in a plastic bag inside the packaging Instruction manual Hydraulic test certificate 4 adjustable feet b b The second anode for installation instead of the in spection flange is supplied separately and must be fitted by the installer The first an...

Page 14: ...e sure that the storage cylinder is perfectly stable and then remove the pallet Carefully rotate and slide the storage cylinder off the pla tform on to the floor Remove the platform Position the storage cylinder as required Adjust the feet to ensure that the storage cylinder is per fectly level 17 b b Wear suitable personal protective equipment and use suitable safety devices a a Do not dispose of...

Page 15: ... and adjust as necessary to compensate for any unevenness in the floor 17 The casing and insulation can be removed to facilitate ac cess into the place of installation To do so proceed as follows Remove the plug 2 Unscrew the two fixing screws and remove the top insulation section 3 Remove the protective fitting plugs 4 Unzip the plastic cover 5 Cut the straps 6 Remove the insulation shells 7 Reve...

Page 16: ... sure that the system is fitted with safety and control devices in accordance with applicable legislation and standards Make sure that the central heating circuit has been flu shed out to remove all sludge and lime scale and has been vented and seal tested Make sure that a suitable water treatment system is in stalled if the quality of the supply recirculation water so demands Refer to the referen...

Page 17: ...hat all pumps are free and rotate in the right direction Make sure that all circuits have been bled Make sure that the boiler and solar collectors connected to the system shut down correctly when their mains power switches are turned OFF Provided the above checks have been completed satisfac torily restart the system and verify its performance 15 Temporary shutdown If you are going away for a shor...

Page 18: ...product Dry the storage cylinder after cleaning it a a Do not use abrasive products petrol or triethylene INTERNAL CLEANING MODELS IDRA DS 200 to 550 Removing and checking the magnesium anode Remove the plug 1 and insulation 2 and use a sui table wrench to unscrew the anode holder 3 Check the magnesium anode for wear and replace it if necessary On completion of cleaning follow the above steps in t...

Page 19: ...o unscrew the anode holder 6 Check the magnesium anode for wear and replace it if necessary On completion of cleaning follow the above steps in the reverse order to refit all removed parts 5 6 Cleaning inside the storage cylinder Remove the anode 6 as instructed above and then pro ceed as follows Unscrew the bolts 7 and remove the cover 8 taking care not to damage the magnesium anode 6 Remove the ...

Page 20: ...lfunctioning Check the pump The water temperature from the boiler is too low Check the temperature setting There is air in the primary circuit Bleed the circuit SOLAR COLLECTOR CIRCUIT FAULT CAUSE SOLUTION The storage cylinder functions incorrectly or irregularly There is air in the circuit Bleed the circuit The flow rate is too low or too high Check the flow rate of the collector circuit Pressure...

Page 21: ... on the environment and save energy before leaving for the weekend or a short break etc pro vided outdoor temperatures will remain above ZERO sim ply adjust the storage cylinder s thermostat to its minimum temperature b b If outdoor temperature may drop below ZERO risk of freezing perform the operations described in the Preparing for extended periods of disuse section 23 Preparing for extended per...

Page 22: ...22 END USER ...

Page 23: ...23 END USER ...

Page 24: ... LC Italy Customer Service 199 13 31 31 www berettaclima it The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liable to modification without notice ...

Reviews: