15
INSTALLER
If suitable equipment is not on hand to lift the storage cylin-
der off the pallet using the eyebolt, proceed as follows.
- Place a platform of about half the height of the pallet near
the storage cylinder. Make sure the platform is able to
support the weight of the storage cylinder.
- Remove the brackets (1) then carefully rotate and slide
the storage cylinder off the pallet on to the platform.
- Make sure that the storage cylinder is perfectly stable,
and then remove the pallet.
- Carefully rotate and slide the storage cylinder off the pla-
tform on to the floor.
- Remove the platform. Position the storage cylinder as
required.
Fit the feet provided into the holes in the bottom of the sto-
rage cylinder and adjust as necessary to compensate for
any unevenness in the floor.
17
The casing and insulation can be removed to facilitate ac-
cess into the place of installation. To do so, proceed as
follows.
- Remove the plug (2). Unscrew the two fixing screws and
remove the top insulation section (3).
- Remove the protective fitting plugs (4).
- Unzip the plastic cover (5).
- Cut the straps (6).
- Remove the insulation shells (7).
Reverse the above steps to fit the insulation again.
b
Make sure that the insulation shells (7) are securely
fixed in place by straps before fitting the plastic co-
ver. Use a strap wrench if necessary.
2
3
4
5
7
6
b
Wear suitable personal protective equipment and use
suitable safety devices.
a
Do not dispose of packaging material into the envi-
ronment, or leave it within the reach of children, since
it can become a potential hazard. Dispose of packa-
ging material in compliance with applicable legisla-
tion.
Summary of Contents for IDRA DS 1000
Page 1: ...solar storage cylinder IDRA DS INSTALLATION MANUAL USER MANUAL SOLAR ...
Page 22: ...22 END USER ...
Page 23: ...23 END USER ...