4
Bentone
1. General Information
165 105 01-2 2021-12-07
The burner may only be used for its intended purpose in accordance with the
product’s technical data.
We reserve the right to make design changes and cannot be held liable for
any misprints or typographical errors.
Modifying the design or using accessories or components that have not been
approved by Enertech in writing is strictly prohibited.
This Installation and Maintenance manual:
• is to be regarded as part of the burner and must always be kept near
the installation site.
• must be read prior to installation.
• is intended for use by authorised personnel.
1.1 Delivery inspection
• Make sure everything is delivered and the goods have not been
damaged during transit.
Transport damage must be reported to the shipping company.
• If something is wrong with a delivery, report it to the supplier.
1.2 Safety
- before installation:
• Installation and work on the burner and associated system
components may only be carried out by persons who have undergone
relevant training.
• The product is packaged to prevent damage from occurring when
handled – Handle the product with care! Lifting equipment must be
used to lift larger packages.
• The products must be transported/stored on a level surface in a dry
environment, max. 80% relative humidity, no condensation.
Temperature -20 to +60 °C.
- installation:
• The burner must be installed in accordance with local regulations for
fi re safety, electrical safety, and fuel distribution.
• The premises must comply with local regulations pertaining to use of
the burner, and must have adequate air supply.
• The installation site must be free of chemicals.
• Fire extinguisher with Class BE recommended.
• Make sure when installing the burner that there is enough space to
service the burner.
• The electrical installation must be professionally carried out in
accordance with applicable high voltage regulations.
• Make sure that the burner is suitable for the application (see Technical
Data).
Summary of Contents for B 45i A2.2H J/K
Page 12: ...12 Bentone 11 12 13 14 15 3 16 18 19 20 21 22 23 25 24 17...
Page 106: ......
Page 107: ......
Page 108: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...