4 - 114
FAIRING
INSTALLATION OF THE UPPER CHAIN GUARD
A
10*
11*
11*
Park the bike on a level surface.
IMPORTANT NOTICE
Prop the bike on suitable supports so that it cannot fall.
Install:
Proceed using the opposite order to removal.
Tighten:
•
the screws (11*) Fig. A
to the following torque:
T.R.
Torque 10 N*m
Use Loctite thread locker to secure.
Loctite 243
NOTE:_________________________________
The numbers marked (*) are shown in the replacement parts
table in the “Rear shock absorber” chapter, “Rear shock ab-
sorber removal” section.
COPY - Moto GB - Grant Martland - [email protected]
Summary of Contents for TRK 502
Page 6: ...1 1 1 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 19: ...2 2 1 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 37: ...3 1 3 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 40: ...3 4 NOTES COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 95: ...4 1 4 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 254: ...5 1 5 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 345: ...6 1 6 COPY Moto GB Grant Martland grantmartland motogb co uk ...
Page 360: ...ELE 16 7 COPY Moto GB Grant Martland grantmartland motogb co uk ...