Testing and measuring
38
Test sequence with warm-up and cool-down period
If "warm-up and cool-down period" is activated on the device settings, UNIMET waits until the DUT
is powered up or ready for operation. Once the DUT has been connected to the mains supply, the
following message appears:
Wait until the DUT is powered up and then confirm by pressing the ENTER button "
".
After the last test step carried out at this phase position, UNIMET will wait for the DUT to shut down.
Wait until the DUT is powered down and then confirm by pressing the ENTER button "
".
With all test sequences which put the DUT into operation, a test is carried out with the phase position
reversed. In this case, the DUT is powered up and powered down one more time.
WARM-UP PERIOD:
Boot up DUT!
Next:
COOL-DOWN PERIOD:
Shut down DUT!
Next:
Summary of Contents for UNIMET 300ST
Page 50: ...Testing and measuring 50 TGH1365en 10 2012...
Page 58: ...Data 58 TGH1365en 10 2012...
Page 61: ......