Installation Introduction

200799_1

Before the product can be installed, consideration will need to be given to routing the power supply to the 
fire. This will affect the stages of the installation process. We advise a qualified electrician conduct any 
electrical parts of the installation. 

Note:  A single wall socket is required for the operation of the fire, please refer to the separate fire 

instructions for further information. 

This product has been designed to be installed into a

pre-fabricated

, or existing

Masonry

chimney breast.

Please seek advice from a professional, with reference to the structural integrity of the installation site.

If the product is to be installed into a open chimney or flue, it is important that the chimney/flue is blocked
off to prevent any up/down draughts and falling debris which could restrict and alter the airflow of the
product.

The product should never be sealed into an opening with the use of silicones or adhesives as this can also
alter the airflow and hinder any future servicing of the product.

It is essential to include a lintel at the required height to ensure the appliance does not support the weight
of the finished wall.

A pre-assembled MDF framework has been supplied to ensure that the product is installed at the required
minimum internal clearances for operation. Before commencing with installation please ensure the

Fire

Support Brackets

have been attached to the MDF framework, these set the minimum depth required for

installation-

238mm

. As shown in

Diagram 1

below.

Diagram 

1

Fix the 

2 x Fire Support Brackets 

using 

4 x No.8 x15mm Domed-Head Screws 

into the pre-drilled holes on 

the MDF framework . 2 x per bracket.

Fire Support 

Brackets

MDF 

Framework

For installation into a

pre-fabricated

chimney breast follow the instructions on

Page 5

then continue onto

Page 7.

For installation into a existing

Masonry

chimney breast follow the instruction on

Page 6

then continue onto

Page 7.

MDF

Framework

H

(mm)

W

(mm)

Min Inset

(mm)

Volta 42”

518

1102

Min 238

Volta 32”

518

852

Min 238

Summary of Contents for Pryzm Volta 32

Page 1: ...1 Instructions for installation Patent pending UK Registered Design R3 May 2020 200799_1 Volta 42 Volta 32 Pryzm Inset Fire Conversion Kit ...

Page 2: ...Chimney Breast P6 Assembly Fire Conversion Kit Installation P7 Assembly Fire Conversion Kit Installation continued P8 Installation Positioning the fire P9 Installation Magnet Bracket P10 Installation Fixing the Fire P11 Installation Fixing the Fire continued P12 Installation Fitting the Trim P13 Maintenance P14 200799_1 Contents ...

Page 3: ...Side Panels 4 X Angle Brackets 18 X No 8 x15mm Domed Head Screws 4 X No 8 x13mm Pan Head Washer Screws 4 X 10 Ø x 4mm Magnets 1 X Magnet Bracket 2 X Fire Support Brackets 1 X Pre assembled 1000L or 750L MDF Framework Dependant on the model purchased 1 X 1000L Trim or 750L Trim Dependant on the model purchased Note Please be sure to take extra care when removing the trim from the packaging and hand...

Page 4: ...ening with the use of silicones or adhesives as this can also alter the airflow and hinder any future servicing of the product It is essential to include a lintel at the required height to ensure the appliance does not support the weight of the finished wall A pre assembled MDF framework has been supplied to ensure that the product is installed at the required minimum internal clearances for opera...

Page 5: ...studwork around the MDF Framework The studwork construction in Diagram 2 is for guidance only Ensuring the front face of the MDF framework is flush with the studwork fix in position through the pre drilled holes in the MDF Framework 3 x fixing holes in the top and bottom and 1 x fixing hole in each side Diagram 2 MDF Framework Fire Support Brackets Studwork Finishing Plasterboard skim and decorate...

Page 6: ...h the face of the brickwork As shown in Diagram 4 Diagram 4 is for guidance only the final construction will be dependant on how the existing chimney breast is built if a lintel is required please seek advice from a professional with reference to the structural integrity of the installation site Ensuring the front face of the MDF Framework is flush with the brickwork fix in position through the pr...

Page 7: ...ain the 10 x No 8 x12mm Domed Head Screws 5 x per side The side panels are no longer required and can be discarded If applicable remove the transit brackets from the bottom of the fire as shown in Diagram 7 Remove the 4 x No 8 x12mm Domed Head Screws The transit brackets and screws are no longer required and can be discarded Diagram 6 Diagram 7 ...

Page 8: ...2mm Domed Head Screws 2 x per bracket Ensure the brackets are fixed in the correct orientation the small tab on each bracket should be positioned as shown in Diagrams 8 9 Diagram 8 Diagram 9 Tab Tab The tabs are used to ensure the brackets are installed at the correct distance from the finished wall surface in later procedures ...

Page 9: ...om long edge of the finished opening Once clear of the opening position the fire towards the back of the opening so it is clear of the front edge and the MDF Framework in the opening is exposed as shown in Diagram 11 This will enable the magnet bracket to be fitted See page 10 Ensure the product is connected to the power supply before proceeding further Diagram 10 Diagram 11 Note Dependant on the ...

Page 10: ...ramework this will ensure the bracket is fitted centrally in the opening Before fixing in position align the tabs on either end of the bracket with the face of the finished wall surface as shown in Diagram 13 This will ensure the bracket is installed at the correct distance from the front face for the magnet to engage correctly with the trim in a later procedure Diagram 12 Diagram 13 Finished Wall...

Page 11: ...am 16 Diagram 16 Pull the fire forward to the front of the opening and centralise Align the tabs on the angle brackets with the face of the finished wall surface as shown in Diagram 14 Fix through the slot in each bracket into the pre drilled holes in the MDF Framework using 4 x No 8 x15mm Domed Head Screws whilst aligning the tabs with the face of the finished wall surface as shown in Diagram 15 ...

Page 12: ...e brackets as shown in Diagram 17 Secure in position using the 4x No 8 x13mm Pan Head Washer Screws as shown in Diagram 18 Diagram 18 Diagram 17 Attach the 4 x Ø 10 x 4mm Magnets in postion 1 x in each bottom corner of the opening onto the metal side panels as shown in Diagram 19 1 x at each end of the magent bracket as shown in Diagram 20 Diagram 19 Diagram 20 Magnet ...

Page 13: ...tion is complete please refer to the fire instruction to see how to dress the logs on your fire and for the full fire operation guide Diagram 20 Once in position secure though the slots on the underside of the trim into the pre drilled holes in the MDF Framework using 4 x No 8 x15mm Domed Head Screws as shown in Diagram 21 Note Please handle the trim with care when positioning ...

Page 14: ...e removed by a piece of soft damp lint free cloth with a good quality household glass cleaner The front glass panel should always be completely dried with a clean lint free cloth or paper towel CAUTION Abrasive cleaners should not be used on the glass panel or Trim Liquids should not be sprayed directly onto any surface of the unit Recycling All cardboard packing is recyclable 200799_1 Should you ...