8
Installation- Floor-Standing
–
Suite
Continued……..
200817
Ensuring the
Plinth
is
level
and centrally positioned in the installation location, measure up
380mm
from both
inside edges of plinth and using a straight edge lightly mark a horizontal line either side of the previously marked
centre line.
See Diagram 7.
Locate the
Wall Mount Bracket-
(screwed to the rear of the fire)
.
Measure and lightly mark the centre of the
Wall
Mount Bracket
and offer the
top
edge of the
Wall Mount Bracket
up to the previous drawn horizontal line,
level
and mark the fixing positions in the bracket on the wall behind.
See Diagram 8.
Once marked, drill the fixing positions. Depending on the wall medium, it may be necessary to plug the drilled holes.
See P17 ‘Important Note’.
Finally screw and secure the
Wall Mount Bracket
to the wall using suitable screws.
See P17 ‘Important Note’.
See Diagram 9.
Diagram 7
Diagram 8
Diagram 9