28
Installation MACH104-PoEP
Release 06 11/2013
Figure 5: Assembly in a switch cabinet with sliding/mounting rails
1 - MACH104-PoEP device
2 - sliding/mounting rail
3 - 19“ switch cabinet
Figure 6: Mounting the MACH104-PoEP in the 19" cabinet
Fasten the device by screwing the brackets to the switch cabinet.
Note:
When operating the device in an environment with strong vibrations,
you have the option to additionally fasten the back of the device to the switch
cabinet using two brackets.
You can obtain additional brackets as accessories
(see on page 41
.
2.5.4
Mounting on the wall
Note:
In order to fix the device to a concrete wall choose screws with a thread
major diameter of at least 5 mm.
Use the pre-mounted brackets included in the delivery.
See figure 7 on page 29.
Additionally attach two brackets to the back of the device.
See figure 7 on page 29.
P
1
LS
D
A
2
3
4
5
6
7
8
M
4-8
TP-RJ45
LS
DA
LS
DA
LS
DA
LS
D
A
LS
DA
LS
DA
LS
D
A
R
1
LS
DA
2
3
4
5
6
7
8
LS
D
A
LS
DA
LS
D
A
LS
D
A
LS
DA
LS
DA
LS
D
A
P
1
LS/
DA
2
3
4
5
6
7
8
1
4
7
2
5
8
3
6
M4-F
AS
T 8SFP
P
1
2
3
4
5
6
7
8
1
4
7
2
5
8
3
6
P
P1
P2
P3
P4
RM
RL1
RL2
FA
N
RUN
L/D
FD
X
1000
AN
TP
/FO
RIN
G
PORT
ST
BY
LED
TEST
2
1
1
2
3
4
LED
MED
IA SLO
TS
M
4-AIR
SLOT
.PORT
USB
V.24
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
SE
LEC
T
LED
M
ACH
400
2 48
+4
G
FA
U
LT
RL2
LS/DA 6.
1
RL1
LS
/DA
M4-F
AST
8TP-
RJ
45
-P
oE
M4-F
AST
8SFP
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
2
3
1
V.24
USB
A
ufk
leber M
A
C-A
d
resse
P
FAULT
FAULT
Sb
RM
1
2
3
4
13
14
15
16
17
18
19
20
5
6
7
8
9
10
11
12
x y
MACH104