2122.6-0000010 OM
127
Setting of “buckle unlocked” shall be carried out in the following order:
- turn guiding pin 2 for
≈
90
°
and match the groove in guiding pin 2 with the hole in
slide piece 4;
- while rotating guiding pin 2, place the hole in slide piece 4 on the groove center
(adjust the right and left buckles);
- insert linch pin 3 into the hole and fix it with the clip.
ATTENTION: WHILE PERFORMING TRANSPORT WORK, IT IS REQUIRED TO USE
THE SETTING “BUCKLE LOCKED”!
ATTENTION: WHILE TRACTOR OPERATION WITH THE MOUNTED IMPLEMENT
OR MACHINE, IT IS REQUIRED TO USE THE SETTING “BUCKLE LOCKED” OR “BUCKLE
UNLOCKED” ACCORDING TO THE INSTRUCTIONS OF THE OPERATOR’S MANUAL ON
COUPLED IMPLEMENTS (MACHINES) OPERATION!
IT IS NOT ALLOWED TO USE BUCKLE WITHOUT FIXING THE SLIDE PIECE ON
THE GUIDING PINS WITH A LINCH PIN!
4.3.3.2 Lifting rods
A lifting rod consists of a screw with hinge pivot 1 (figure 4.3.5), pipe 2, yoke 3, splint
pin 4, pin 5, washer 6, counter nuts 7.
Adjustment of the lifting rod length is carried out in the following order:
- unscrew counter nut 7;
- while rotating pipe 2 clockwise or counterclockwise, change the lifting rod length;
- adjust the lifting rod length and locknut the screw connection with counter nut 7.
While setting pin 5 into the upper hole of yoke 3 as shown in figure 4.3.5, the lifting rod
length shall be adjusted within 630 to 830mm.
During shipment from the works, pins 5 are mounted into the upper holes of yokes 3,
lifting rods are adjusted for the length of 780mm.
While setting pin 5 into the lower hole of yoke 3, the lifting rod length shall be adjusted
within 700 to 900mm.
Setting of the lifting rod shall be carried out in the following way:
-
while tractor operation with mounted and semi-mounted implements and ma-
chines (except for wide-cut), RLL links shall not move freely in the lifting rod yokes. For this,
pin 5 in the lifting rod shall be fixed into one of yoke 3 holes. Setting of pins 5 on the left and
right lifting rod shall be equal;
-
while tractor operation with wide-cut mounted or semi-mounted implements, it is
required to fix pins 5 in lifting rods into the grooves (cut slots) “A” of yokes 3 to provide vertical
movement of lifting rods in relation to the lifting rod yoke. While setting pins 5 into the grooves
“A” of yokes 3, the lifting rods length shall be adjusted within 700 to 900mm.
1 – screw with hinge pivot assembly; 2 – pipe; 3 – yoke; 4 – splint pin; 5 – pin; 6 – washer; 7 – counter nut.
Figure 4.3.5
– Lifting rod
While operating with implements, adjust the right lifting rod length according to the
soil processing depth.