QUICKFIRE®
Signature
®
Series
1MANUL826
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
37
Installation
Installing Cleaning Material
Upper Hub: Neo-
Tex™
Note:
The cleaning material for the upper hub comes in two thicknesses 1/8” thick and 1/4”
thick. Be sure to install the correct thickness in the correct location.
1)
Locate 12 of the 41” x 8” x 1/8” thick Neo-Tex™ pieces and twelve 8” Wash Clips.
2) Place the Wash Clips in the center of the pack as shown below. Fold the Neo-
Tex™
pieces
in half and slide the Wash Clips “C” Channels.
3) Fill every t
hird “C” Channel slot as shown below (12 pieces in all). Make sure the Packs
are pushed all the way to the bottom of the hub.
4)
Locate 24 of the 25” x 8” x 1/8” thick Neo-Tex™ pieces and twelve 8” Wash Clips.
5) Place the Wash Clips ends through the holes of both packs as shown below.
6)
Fill every third “C” Channel slot as shown below (12 pieces in all). Make sure the Packs
are pushed down as far as possible.
Be sure the flaps are in the direction as shown
below
.
Neo-
Tex™
Wash
Clip
Insert Wash
Clips into
Neo-
Tex™
holes
Fold Neo-
Tex™
in
half to slide into
“C” Channels
Hub Overhead View
Fill every third slot
12
(41” x
8”) Pieces of
Neo-
Tex™
Folded in half
12 Wash Clips
2 piece
s of 25” x 8” x x1/8”
thick Neo-
Tex™
per slot
Direction of
Travel