CURRENT REVISION LOG
1MANUL826
Belanger, Inc. * PO BOX 5470 * Northville, MI 48167-5470 * Ph (248) 349-7010 * Fax (248) 380-9681
Rev
Release
Date
Page Description
03
03/18/22
3
Updated Limited Warranty
6
Added the two Warnings about Pneumatics
(per Project #10055)
9
Under Utility added Hydraulic information
10
Added page, Installation: Identify Conveyor
(per Project #32-523)
11
Removed dimension 153
”
13
Added Note at top of the
page for the 13” and14
-1
/2” Conveyor
Updated dimension to driver side QuickFire® Wrap 49-
1/2”
or
51”
See Note Below
Added See Note Below to dimension 103-1/2
”
Added to note under image: (
13” Co
nveyor: 49-
12” / 1
4-
1/2” Conveyor: 51” and the 103
-
1/2”)
(per
Project #32-523)
14 &15 Removed positioning dimensions from the pages for the QuickFire® Wraps
16
Added dimension to driver side QuickFire® Wrap
13” Conv
eyor: 49-
1/2” and 14
-
1/2” Con
veyor:
51”
In Step 2 after 49-
1/2”
, added: if the conveyor is
13” wide or 51” if the conveyor is 14
-1/2
” wide
as
shown below.
(per Project #32-523)
23
Added 1WASHR-FL498 to image
24-29
Replaced these pages with the information in the Mix and Match Manual - Securing the Head
Assembly to the Boom and Installing Drive Shaft Components for both Hydraulic & Electric
27
Corrected Knob part number from 8265 to 8259, 7094 to 8258, and added part number 1NUT-
JM500 to Jam Nut
(per Change Request #87)
Added to Step 1: Parts 8259 and 8258 are part of the Head Assembly
32
Added Neo-Tex
™
fill information to the Lower Hub on the image
(per Change Request #37)
Changed subtitle from Overview for Neo-Tex
™
Fill to Overview of Neo-Tex
™
Fill
34
Added more Neo-Tex
™
fill with Nylon Brush information to the image
Changed subtitle from Overview for Fleet Wash with Nylon Brush Packs to Overview of Neo-Tex
™
Fill with Nylon Brush Packs for Fleet Wash
(per Change Request #37)
36
Inserted page showing Overview of Neo-Tex
™
Fill for the Upper Hub
(per Change Request #37)
41-54
Replaced these pages with the Utility Connections information in the Mix and Match Manual
46
In the note under Confirming Wheel Rotation changed the word below to above
63
Changed: During operation, the transition between portions of operation (i.e., front to side, side to
rear) will indicate by what is observed the adjustments needed for optimal QuickFire® Wrap
operation.
To: During a vehicle wash, observe the transitions between the different portions of the wash
operation (i.e., front to side, side to rear) this will indicate if adjustments are needed to optimize the
operation of the QuickFire® Wrap.
65
Under Routine Procedures, Daily removed Check the che
mical injection pump(s)…and Hose down
the component and surrounding area at the end of each day. Added Check all hydraulic hose
connections for leaks and check for water, chemical, or air leaks
…
Under Weekly removed: Check all tanks periodically for sludg
e… and added Hose down the
component and surrounding area
…
Under Monthly removed Wash
component down with a good degrimer… and greas
e bearings and
added Wash components frame and Check cleaning material for wear
Under Quarterly removed Scrub down aluminum
portions…
66
Added Spherical Bearing Replacement Tip for Hydraulic Motor from Mix and Match Manual
67
Added Hydraulic Hose Replacement Procedure from the Mix and Match Manual
68
Add Electric after the Spherical Bearing Replacement Tip subheading
73
Added Powder Coating Maintenance information
74-75
Added Powder Coating Repair information
76
Changed Cylinder Mount Weldment part number from 8239 to 112304 (DS) /112305 (PS)
(per
Project #10055)
78
Added reference part numbers 8258 & 8259 to the exploded view
Added note: Reference Parts 8258 & 8259 are part of the Electric & Hydraulic Head Assemblies
shown on the following pages
(per Change Request #88)
Added Enlarged View at bottom and notes for 1NUT-RG942