BEKOMAT 20, 20 FM
8
Installation
•
Instalación
Installation
•
Instalação
wrong • no correcto
incorrect • incorrecto
correct • correcto
correct • correcto
english
1. Feed pipe and fitting at least ½“!
(internal dia 0.51 inch)
No filters in feed line
Slope in feed line > 1%!
Only use ball valves with full open
port!
2. Operating pressure: min. 12 psig
max. 230 psig
3. Short pressure hose!
Please fix the hose.
4. For each metre of rising slope in the
outlet line, the required minimum
pressure will increase by 1.5 psig.
The rise of the outlet line must not
exceed 17 feet!
5. Lay collecting line (min. ½” ) with 1%
of slope.
6. Lead discharge pipe from the top into
collecting line.
Note: Pressure differences!
Each condensate source must be drained
separately!
Note: Deflector area!
If drainage is to take place directly from a
line, it is advisable to arrange the piping
so that the air flow is diverted.
Note: Continuous slope!
Water pockets must also be avoided
when laying a feed pipe.