
12.2 Decommissioning work
Illustration
Description / explanation
X2
X2
X1
X1
1. Interrupt the condensate feed via the condensate inlet
line
[X1]
(e.g. by closing the recommended shut-off
valve
[X2]
).
Power
Alarm
Service
TEST
2.
Press the TEST button briefly multiple times.
0
The
BEKOMAT
®
is depressurised
0
The condensate remaining in the
BEKOMAT
®
is
drained
3. Disconnect the
BEKOMAT
®
from the voltage supply
and switch off all power.
BEKOMAT
®
33iU / 33iU CO
Original installation and operation manual
58 | 68