Exchange work
Illustration
Description / explanation
19
20
20
14
21. Place the condensate collecting container cover
[19]
on the condensate collecting container
[14]
and insert
the 4 hexagon socket head cap screws
[20]
.
22. Tighten the 4 hexagon socket head cap screws
[20]
cross-wise with a torque of 8 Nm +2 Nm
(5.9 ft-lb +1.46 ft-lb).
14
25
23. Clean the sealing faces
[25]
on the condensate
collecting container
[14]
using a clean cloth and
without detergent.
24
13
24. Check to ensure the new Service-Unit
[12]
fits the
control unit
[A]
:
0
Model designation
0
The colour of the locking hook
[X7]
is identical to
the colour of the control unit
25. Check the new O-rings
[13, 24]
on the new
Service-Unit. Remove the transport lock from the
O-rings
[13, 24]
.
BEKOMAT
®
33iU / 33iU CO
Original installation and operation manual
50 | 68