
Exchange work
Illustration
Description / explanation
Power
Alarm
Service
TEST
2.
Press the TEST button briefly multiple times.
0
The
BEKOMAT
®
is depressurised
0
The condensate remaining in the
BEKOMAT
®
is
drained
9
X3
3. Remove the hose connection
[9]
with the hose
[X3]
.
X2
X1
4. Remove the condensate inlet line
[X1]
and the
recommended shut-off valve
[X2]
from the condensate
inlet and disassemble.
BEKOMAT
®
33iU / 33iU CO
Original installation and operation manual
46 | 68