Mechanical installation
Version: 1.0
───
47
eXtended Transport System
Avoid dirt
When assembling the XTS Hygienic, make sure that all parts are
free from dust and dirt.
Check that the machine bed has been manufactured correctly
Check before assembling whether the distances between the locat-
ing pins in the machine bed are correct.
250 mm ± 0,05 mm
The distance between the center of the first locating pin bore for one
module to the center of the first locating pin bore for the next module
must be 250 mm. The manufacturing tolerance is ± 0.05 mm.
Assembly example
This chapter contains information on the assembly of an XTS Hy-
gienic with straight modules, curved modules, guide rails and
movers. The assembly is described taking the example of a system
with a circumferential length of 3 m.