
Microseparator™ Coolant Systems Transport, Installation, & Initial Startup
M000005_A - V Twin Ultra Transport & Installation 5.2-EN TM
25/78
10.7
Compressed Air Connection
Refer to “Connection Schedule Drawings” for all utility requirements and
connection dimensions.
10.7.1
Microseparator™ Standard System – CF65
Figure 15 - Connect Air Supply CF65 G
Figure 16 - Connect Air Supply to Main Tank CF65 G
To main air
supply
To main tank
using air line
provided.