BAYKAL
EDITION NO :
HGL
SECTION :
DATE OF ISSUE :
November 2009
PAGE :
48
6.5.4. Operating the machine
6.5.4.1. First start-up and getting ready to work:
Figure 6.5.4.1
Figure 6.5.4.2
Figure 6.5.4.3
!
The machine must be first started-up and be put into service by
authorized and qualified personnel.
PROCEDURE:
Before putting the machine into service, perform following items
sequentially.
a)
Switch on the main switch in the way shown in the
Figure 6.5.4.1
.
The
reset lamp
shown in
Figure 6.5.4.3
will lit. (If not, there is either a
bulb failure or a disconnection in the electrical circuitry).
b)
Check the rear side of the machine and make sure that the safety switch of
the rear fence is engaged. Push the
rear reset button
shown in
Figure
6.5.4.2
;
the reset lamp
will be off. (If it remains lighted, check the back
gauge area against anything that prevents the transmitter and the receiver
from contact.)
Summary of Contents for HGL C Series
Page 15: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 15 Figure 4 1...
Page 17: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 17 INSTALLATION DIAGRAM...
Page 98: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 98 APPENDIX A SPARE PART LIST...
Page 99: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 99...
Page 100: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 100 B HYDRAULIC CIRCUIT DIAGRAM...
Page 101: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 101...
Page 102: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 102 C ELECTRIC CIRCUIT DIAGRAM...
Page 103: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 103...
Page 104: ...BAYKAL EDITION NO HGL SECTION DATE OF ISSUE November 2009 PAGE 104 ADDITIONAL MANUALS...