2. Remove the front panel.
8.2.2.
Checking the hydraulic pressure
The hydraulic pressure must reach a minimum of 0.8 bar. If
necessary, top up the water level in the heating system
(recommended hydraulic pressure between 1 and 2 bar).
CAUTION
4
Before filling, open the valves on every radiator in the
installation.
4
Ensure that the boiler is switched off.
1. Fill the system with clean tap water (advised water pressure is
between 1 and 2 bar).
2. Check the tightness of the water connections.
3. Turn the boiler on.
8.2.3.
Checking the expansion vessel
Check the expansion vessel and replace it if necessary.
Initial pressure of the expansion vessel is 1.0 bar (± 0.2).
8.2.4.
Checking the ionization current
Check the ionization current at full load and low load. The value is
stable after 1 minute. If the value lies below 3 µA, replace the ignition
electrode.
¼
See chapter: "Replacing the ionization/ignition electrode", page
58.
R000405-A
2
2
3
R000733-A
4
20
120
50
100
°C
bar
0
3
1
2
8. Checking and maintenance
Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 24
54
02092014 - 7619497-02