5.10.3.
Filling the system
CAUTION
4
Before filling, open the valves on every radiator in the
installation.
4
Ensure that the boiler is switched off.
1. Fill the system with clean tap water (advised water pressure is
between 1 and 2 bar).
2. Check the tightness of the water connections.
3. Turn the boiler on.
After the power is switched on, the boiler always runs
through an automatic venting programme lasting approx.
4 minutes (During filling, air can escape from the system
via the automatic air vent). If necessary, top up the water
level in the heating system (recommended hydraulic
pressure between 1 and 2 bar).
CAUTION
When venting, ensure that no water enters or makes
contact with the casing and electrical parts of the boiler.
1
2
3
4
T000181-B
R000733-A
4
20
120
50
100
°C
bar
0
3
1
2
5. Installation
Baxi MainEco Combi and System 24 - 28 - 35 / 18 - 24
40
02092014 - 7619497-02