www.centralheating.co.uk
www.centralheating.co.uk
*All installations in England and Wales must be
to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance
will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
Commissioning Engineer’s Signature
Customer’s Signature
ALL INSTALLATIONS
Record the following:
At max. rate: CO ppm
AND
CO/CO² Ratio
At min. rate: (where possible) CO ppm
AND
CO/CO² Ratio
The heating and hot water system complies with the appropriate Building Regul
s
e
Y
s
n
o
i
t
a
The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s
s
e
Y
s
n
o
i
t
c
u
r
t
s
n
i
The operation of the boiler and system controls have been demonstrated to and understood by the
s
e
Y
r
e
m
o
t
s
u
c
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the
s
e
Y
r
e
m
o
t
s
u
c
14.4 Service records
SERVICE 01
Date:
Engineer name:
Company name:
Telephone No:
Gas safe register No:
Record:
At max. rate:
CO ppm
AND
CO² %
At min. rate:
(Where Possible)
CO ppm
AND
CO² %
Comments:
Signature
SERVICE 02
Date:
Engineer name:
Company name:
Telephone No:
Gas safe register No:
Record:
At max. rate:
CO ppm
AND
CO² %
At min. rate:
(Where Possible)
CO ppm
AND
CO² %
Comments:
Signature
SERVICE 03
Date:
Engineer name:
Company name:
Telephone No:
Gas safe register No:
Record:
At max. rate:
CO ppm
AND
CO² %
At min. rate:
(Where Possible)
CO ppm
AND
CO² %
Comments:
Signature
SERVICE 04
Date:
Engineer name:
Company name:
Telephone No:
Gas safe register No:
Record:
At max. rate:
CO ppm
AND
CO² %
At min. rate:
(Where Possible)
CO ppm
AND
CO² %
Comments:
Signature
SERVICE 05
Date:
Engineer name:
Company name:
Telephone No:
Gas safe register No:
Record:
At max. rate:
CO ppm
AND
CO² %
At min. rate:
(Where Possible)
CO ppm
AND
CO² %
Comments:
Signature
SERVICE 06
Date:
Engineer name:
Company name:
Telephone No:
Gas safe register No:
Record:
At max. rate:
CO ppm
AND
CO² %
At min. rate:
(Where Possible)
CO ppm
AND
CO² %
Comments:
Signature
It is recommended that your heating system is serviced regularly and that the appropriate Service Interval Record is completed.
Service Provider
Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions.
14 Appendix
7696317 - 1 - 21032018
79