CONTENTS
PAGE
5
PAGE
6
PAGE
7
Fireplace Opening
Hearth Mounting
Wall Fixing
PAGE
8-15
Initial Preparation
Electrical Connections
Gas Supply
Fitting the Fire
PAGE
16-18
Spillage Detection
PAGE
19
PAGE
20-23
Cleaning the Burner and Injectors
Cleaning the Pilot Assembly
PAGE
24-30
Initial Preparation
Light Bulbs
Glass Frame Assembly
Rope Seal
Coal Bed
Burner and Injectors
Pilot Assembly
Electro-Magnetic Unit
Light Switch and Micro-switch
Gas Control Tap and Pilot Filter
Electrode Lead, Resistor and Spark Generator
PAGE
31
PAGE
32-33
PAGE
34-35
Introduction
Technical Data
Site Requirements
Installation
Commissioning the Fire
Fitting the Outer Case
Annual Servicing
Changing Components
Short Parts List
Fault Finding
Renewal
3