6
9. Maintenance bypass switch
10. Input/Output terminal (Refer to diagram 3 for the details)
11. Line input terminal
12. Output terminal
13. Input grounding terminal
14. Output grounding terminal
15. Bypass input circuit breaker/switch
16. Bypass input terminal
17. Grounding terminal
18. Output circuit breaker
2-3. Single UPS Installation
Installation and wiring must be carried out in accordance with the local electric laws and regulations by
trained professionals.
1)
Make sure that the mains wire and breakers of the building are rated for the capacity of the UPS to
prevent electric shock or risk of fire.
NOTE: Do not use the wall receptacle as the input power source for the UPS, as its rated current is less than
the UPS’s maximum input current. The receptacle may be damaged and destroyed.
2)
Switch off the mains switch in the building before installation.
3)
Turn off all the connected devices before connecting to the UPS.
4)
Prepare wires based on the following table:
Model
Wiring spec (AWG)
Input(Ph)
Output(Ph)
Neutral
Ground
LV 15K(L) DUAL
6
6
6
6
LV 20K(L) DUAL
4
4
4
4
NOTE : The selections for color of wires should be followed by the local electrical laws and regulations.
5)
Remove the terminal block cover at the rear panel of UPS. Then connect the wires according to the
following terminal block diagrams: (Connect the grounding/earthing wire first when making other wire
connections. Remove the grounding/earthing wire last when connecting the UPS!)
Terminal block wiring diagram
NOTE 1: Make sure that the wires are connected securely with the terminals.
NOTE 2: Please install the output breaker between the output terminal and the load, and the breaker