9171400990 Rev G
BE1-59N Testing
5-1
SECTION 5
•
TESTING
INTRODUCTION
The following procedures verify proper relay operation and calibration.
Results obtained from these procedures may no fall within specified tolerances. When evaluating results,
consider three prominent factors:
•
Test equipment accuracy
•
Testing
method
•
External test set components tolerance level
OPERATIONAL TEST
Step 1. Perform test setup (Figure 5-1) and apply power to the relay. Verify that the POWER LED is
ON, and that the power supply status contact is open.
Figure 5-1. Typical Test Setup
Step 2. Set all TIME DIALS (if any) to the zero position.
Summary of Contents for BE1-59N
Page 2: ......
Page 6: ...iv BE1 59N Introduction 9171400990 Rev G This page intentionally left blank ...
Page 8: ...vi BE1 59N Introduction 9171400990 Rev G This page intentionally left blank ...
Page 16: ...1 8 BE1 59N General Information 9171400990 Rev G This page intentionally left blank ...
Page 22: ...3 4 BE1 59N Functional Description 9171400990 Rev G This page intentionally left blank ...
Page 24: ...4 2 BE1 59N Installation 9171400990 Rev G Figure 4 1 Panel Cutting Drilling Semi Flush Case ...
Page 32: ...4 10 BE1 59N Installation 9171400990 Rev G Figure 4 9 Sensing Input Connections ...
Page 38: ...5 4 BE1 59N Testing 9171400990 Rev G This page intentionally left blank ...