Operation and Installation Manual PBTC-300
21-54C3-7D0002/-
01/2022-EHT-441169
Notice:
Technical data subject to change without notice.
No claims for damage arising from alternations, errors or misprints shall be allowed.
Seite 40 / 49
Complete the acceptance report
WARNING
Fire and electric shock hazard!
Risk of injury due to insufficiently tested system.
The junction box with thermostat module can only be operated with a completely filled out acceptance report.
Fill in the acceptance report for each heating circuit completely and carefully!
It must be ensured that the insulation resistance measurement is carried out completely during commissioning and results are entered
in the acceptance report. In particular, the installed heating circuit length and the maintenance and ambient temperatures must be
specified.
The acceptance report is available on www.bartec.com.
Each trace heating system may only be put into operation if
The acceptance tests for each heating circuit have been carried out and the acceptance reports are available
The correct condition of the trace heating has been confirmed
The thermal insulation has been completely installed and is in a dry state.
It is ensured that the heating circuit is operated within the data specified by BARTEC.
NOTICE
Complaints can only be accepted within the warranty period with a completely filled out acceptance report.
NOTICE
Additional heating energy required to heat up empty or already filled pipelines is usually not taken into account in the
project planning. When the system is cold started, you should therefore allow sufficient time for the pipeline to reach the
desired temperature.
For further information on heating processes, please contact your local BARTEC representative.
Summary of Contents for PBTC-300
Page 2: ......