Operation and Installation Manual PBTC-300
21-54C3-7D0002/-
01/2022-EHT-441169
Notice:
Technical data subject to change without notice.
No claims for damage arising from alternations, errors or misprints shall be allowed.
Seite 22 / 49
Mounting Insulation Entry Bushing (optional)
Use insulation entry bushing to lead heating cable through
pipe insulation. Order insulation entry bushing separately.
Select the trace heater grommet suitable to the heating ca-
ble type and mount the trace heater grommet into the insu-
lation entry bushing
NOTICE
Plant damage due to unassembled or incorrectly as-
sembled insulation entry bushing possible
Select trace heater grommet suitable to the heating ca-
ble type and mount it carefully
Mounting insulation entry bushing carefully
Mounting Heating Cable Gland
Select the trace heater grommet suitable to the heating ca-
ble type
Note the color of the trace heater grommet and the printed
letter:
Letter ‚P‘: Trace Heater Grommet for heating cable type
PSB (clear color)
Letter ‚H‘: Trace Heater Grommet for heating cable
type MSB (orange color)
Letter ‘P’
Letter ‘H’
Mounting of heating cable types HSB+ and HTSB with CAK
Kit SRB. Order CAK SRB separately.
Delay fixing nut, trace heater grommet and metallic gland
body to the heating cable
WARNUNG
Fire and electric shock hazard due to electrical trace
heating system
Risk of injury from electric current and fire
Select trace heater grommet suitable to the heating ca-
ble type and mount it carefully
Mounting Heating Cable Gland carefully
Preparing Heating Cable
Remove 145 mm of the outer jacket on the end of the trace
heater
4
5
6
7
Summary of Contents for PBTC-300
Page 2: ......