
Distillation Process Analyzer DPA-4.5
Installation and preparation for commissioning
6.1 Safety
Personnel
−
Installation and preparations for commissioning are only to be
performed by specialists for potentially explosive atmospheres
.
−
Have work on the electrical system performed only by
electricians.
Personal protective equipment
The following safety equipment must be worn during all installation
and commissioning work:
−
Safety goggles
−
Safety gloves
NOTE
If other safety equipment is required for certain
tasks, this will be mentioned in the warnings in this
chapter.
Fundamental principles
WARNING
Danger of injury due to improper installation
and commissioning
Improper installation and commissioning can lead
to serious personal injury and material damage.
For this reason:
– Before starting work, ensure there is adequate
space for the work.
– Use caution when handling open, sharp-edged
components.
– Make sure the work area is clean and orderly!
Components or tools that are loosely stacked or
left lying around are a source of accidents.
– Mount the components professionally. Comply
with the specified screw-tightening torques.
– Secure components so that they cannot fall down
or tip over.
December 2013
83