Figure 30. Place roadside face of post 1 towards roadway.
0 - 1.2 m (0 - 4 ft)
Figure 29. Pull string line to follow roadside edge of posts.
Figure 31. Place Ground Strut parallel to string line.
Now follow steps 2 – 14 in the Tangent installation instructions.
Note: The “kink” in the line of rail between rail 3 and rail 4 (at post #7) is
formed by simply pushing the rails around to follow the flared line of posts.
This is not factory bent.
Step 1 - Set Out
Pull a string line out with the desired offset (0 -1.2m; 0-4 ft)
Note that the flare is a straight flare, over the length of the system (11.4m; 38 ft)
The string line should be set to follow the roadside edge of the posts (Figure 29).
All the posts except post 1 have a blockout so take care to place the roadside face of post 1
200mm (8 in) towards the roadway (Figure 30).
Post 1 bottom, the Ground Strut and the Soil Anchor are then placed parallel to the string line on
the roadside of it (Figure 31).
X-Tension - Flared Installation Instructions
INSTALLATION AND MAINTENANCE MANUAL