Lindsay Transportation Solutions Sales and Services, Inc
(888) 800-3691 [U.S. toll free] or +1 (707) 374-6800
13
Step 7 – Assemble Slider Panel onto Rail 1
Start by sitting rail 1 on a blockout or post so that it is raised off the ground as shown (Figure 12).
Slide the Slider Panel onto the downstream end of rail at post 3 location (Figure 13) and bolt into
place using 4 standard splice bolts, pushing the bolt through from the inside of the slider to the
outside so that the
nut is on the traffic face
.
The curved and reinforced (post breaker) end of Slider Panel sits at the rail end.
Use guardrail pin bar or crow bar to assist with lining up splice holes.
Figure 12. Sit rail 1 so it is raised off the ground.
Step 8 – Hang Rail 1
Figure 13. Slide the Slider Panel onto downstream end.
Lift rail 1 with Slider Panel attached and push the slider end over rail 2 (Figure 14). Overlap the
rails as per a standard splice joint overlap.
Bolt rail 1 and blockout to post 2 using a standard post bolt that is supplied (Figure 15).
Re-attach the angle bar to the slider bracket on the backside of the rail (Figure 16).
Figure 14. Push Slider Panel over rail 2.
Figure 15. Bolt rail 1 and blockout to post 2.
Figure 16. Reattach the angle bar.
X-Tension - Tangent Installation Instructions
X-TENSION
®
SYSTEM