5. Installation procedures
Image 5-39
Provide a power path in every open row before inserting tiles.
5.10 Z-alignment of the Solaris LD tiles
Z-alignment
It can happen that after installation some tiles are not correctly aligned in depth due to tolerances. The design of the tile fixation bolt
and nut allows a small correction in depth. This correction is called “Z-alignment”.
A
B
Image 5-40
A: Tile fixation nut, B: Tile fixation bolt with Z-alignment functionality.
The correction exist in moving the most inner corner of the tile in the LED-wall forward by adjusting the tile fixation bolt in the corre-
sponding corner. The maximum allowed adjustment is 1 millimeter which correspond with one full turn (360°) counterclockwise of
the tile fixation bolt (seen from the rear of the tile).
1 mm
max
Image 5-41
Maximum 1 millimeter adjustment of the most inner tile corner.
46
R5976773 SOLARIS LD DISPLAY 02/12/2004
Summary of Contents for Solaris LD 120-8
Page 1: ...Solaris LD display Installation service manual R5976773 00 02 12 2004 ...
Page 4: ......
Page 26: ...4 Set up process of a Solaris LD display 22 R5976773 SOLARIS LD DISPLAY 02 12 2004 ...
Page 66: ...7 Maintenance 1 2 Image 7 1 Remove dust filter 62 R5976773 SOLARIS LD DISPLAY 02 12 2004 ...
Page 84: ...A Specifications 80 R5976773 SOLARIS LD DISPLAY 02 12 2004 ...
Page 86: ...B Order info 82 R5976773 SOLARIS LD DISPLAY 02 12 2004 ...