background image

 
 

 

4087 Walden Avenue 

Lancaster, NY 14086 

 

(716) 685-4040 

f(716) 685-1010 

www.airtek.com 

 
 
 
 

Airtek DB1000 Instruction and Programming Manual 

Portable Dew Point Monitor 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for Airtek DB1000

Page 1: ...1 4087 Walden Avenue Lancaster NY 14086 716 685 4040 f 716 685 1010 www airtek com Airtek DB1000 Instruction and Programming Manual Portable Dew Point Monitor...

Page 2: ...stallation 2 1 Depressurization 2 2 Sample Air Line Installation 2 3 Probe Installation 2 4 Diagram 3 Monitor Installation Placement Probe Cable Connection 4 Operation 4 1 Connect power 4 2 Open Ball...

Page 3: ...itter 2 Mechanical Installation 2 1 Depressurization Prior to installation be sure to safely depressurize the air system in accordance with OSHA practices and principles so installation is done in a s...

Page 4: ...t is to be read Because a 10 cord has been provided the monitor must be within 10 of the probe transmitter 3 2 Probe Cable Connection A 10 cord is provided for connection between the probe transmitter...

Page 5: ...and no need to ever open the case 5 2 Menu Structure To simplify programming the monitors setup functions are divided into two menus A main menu handles all the basic setup functions An advanced feat...

Page 6: ...eing the menu and going right from there Button 2 reset Button 3 max Button 4 ack 1 Energize display If possible leave probe detached 2 Press button 1 should read SETUP 3 Press button 4 until dd dd ap...

Page 7: ...le Corresponding signal at signal connector 6 Probe Recalibration Routine maintenance of the DB1000 probe transmitter is confined to regular re calibrations This work can only be done by exposure of t...

Page 8: ...8 4087 Walden Avenue Lancaster NY 14086 716 685 4040 f 716 685 1010 www airtek com...

Reviews: