3. Installation Guidelines
A
Image 3-14
Mounting the security chain
Image 3-15
Mounting the security hook
C
B
B
Image 3-16
Mounting the security hook (detail)
How to open a secured rigging point?
1. Push the ring (A) of the first projector downwards and hold it in that position. (image 3-17)
2. Turn the locked part (B) of the second projector a quarter counter clockwise and move it upwards.
20
R5976654 SLM R12+ 09022004
Summary of Contents for SLM R12+ Performer
Page 1: ...EVENTS SLM R12 R9010170 OWNER S MANUAL 09022004 R5976654 00...
Page 4: ......
Page 8: ...Table of contents 4 R5976654 SLM R12 09022004...
Page 38: ...4 Connections 34 R5976654 SLM R12 09022004...
Page 82: ...7 Random Access Adjustment Mode 78 R5976654 SLM R12 09022004...
Page 94: ...8 Installation Mode 90 R5976654 SLM R12 09022004...
Page 112: ...9 Service Mode 108 R5976654 SLM R12 09022004...
Page 114: ...10 Programmable Function Keys 110 R5976654 SLM R12 09022004...
Page 118: ...A Standard Source set up Files 114 R5976654 SLM R12 09022004...