Installation
Barco - OV-708/OV-713/OV-715– R59770137 – installation manual – revision 01– September 2007 ________________________________
________________________________
________________________________
_______________________________________________
_______________
_______________
_______________ 35
Step 40
Unpack the screen.
Make sure that the screen layers are put correctly!
Please note:
the sequence and the orientation of the screen layers
as they are put into the screen packaging is the
correct one!
With 2 element screens comprising a Lenticular and a
fresnel element, the front element is the Lenticular
and the rear element is the Fresnel.
Lenticular:
smooth side is the public side, pearly/sandblasted
side towards the projector
Fresnel:
smooth side towards projector, groovy side towards
Lenticular.
Step 41
For your convenience, apply the top horizontal stitch
border and insert the stitch pins before the screen is
mounted.
Put the screen onto the jig.
Summary of Contents for OV-708
Page 1: ...Installation manual OV 708 OV 713 OV 715 R59770137...
Page 15: ......