1. F70 / F90-series multifunctional frame
8,4 Nm
8,4 Nm
1
2
Image 1-19
5.
For the F90 Projector:
a) Mount the four M6 hex screws (reference 1) + spring washer (reference 2) + plain washer (reference 3 ) on the bottom of the
rigging frame to tie the two together.
Tighten the screws with a torque of 8,4 Nm
.
8,4 Nm
8,4 Nm
1
2
3
Image 1-20
b) mount the M8 hex screw with button head + spring plain washer (reference 1, 2 & 3) on the backside of the rigging
frame, into the backside of the projector.
2
Image 1-21
1
3
2
1
Image 1-22
6. Tighten all screws.
Caution:
Forgetting to tighten the screw in the backside of the projector may cause damage to the projector support platform
during transport.
1.6
Installing the additional
fi
lter (F90 only)
How to install the additional
fi
lter
1. Skew the projector to open the side on which the
fi
lter has to be added. For more info, see "Skewing the projector", page 16.
2. Place the
fi
lter into the frame, from the front side of the rigging frame.
R5906768 F70 / F90 MULTIFUNCTIONAL FRAME 22/11/2017
9