Installation
5
Installation
Notice before installation
Choose a solid and safe place (Wall or Pole) for CPE installation
1. Choose the best location of the house and the orientation of the CPE
to get the strongest signal reception from base station.
2. The ambient temperature for E5812A and E5812P series must be
within:
E5812A series: -10°C to 55°C
E5812P series: -40°C to 55°C
NOTE
For lightning protection ground the CPE via Earth Ground Terminal
and optimum
reception, there are a few things you should consider before installation. Please see
“Important Installation Considerations” on page
7 for more details.
Prepare two Ethernet cables
Be sure that one of the cables used is an outdoor grade CAT 5e (or above)
Ethernet cable type and the length of the cables are adequate to reach
the location of the CPE and indoor PPoE are.
Prepare wrenches
Prepare two adjustable wrenches or four combination wrenches. (size:
13mm x 2, 8mm x 1, and 19mm x 1)
Warning:
Do NOT start any traffic test (ex: throughput test and internet browsing)
before the installer returns to the ground.